Sunday, February 22, 2015

Its A Long Time Between Drinks.....

Well, again it has been quite some time since I posted anything on my Blog. Due to constant nagging to Raymond by "he who shall remain nameless" (Craig - you know who you are) we invited the Tuesday Nighters over last Tuesday night. I was somewhat (read - "very") reluctant to have the guys over as we had not really advanced with the layout and I thought I would cop a lot of flak.


However again, as usual, I was wrong. We had a good roll-up and everyone was very supportive. They understood the hiatus I was going through, the second thoughts, the concerns, do we need to rip this up, relay that and so on.


Darren and Geoff, in particular listened to my problems and self-doubts, and again (as in the past) they came up with some very positive suggestions.


The layout had started to grow like topsy with, initially, no serious track planning - at least for the first station. Much to Raymond's chagrin, many of the point motors ended up being located over the top of the timber framing making them exceedingly (frustratingly so) difficult to install let alone wire up whereas with a bit of planning and forethought I could have positioned them better. The track plan for this first station was built as serendipity - no planning it just kind of happened. As it turned out we had to relay a curve several times and respace the passing loops as the window shades on the big K-36 and K-37 locos fouled. We have ended up with a yard that was unnecessarily full of passing loops and lots of trackwork and points.


By the time we got to our second station the sidings were better planned and so Raymond could better access the pointwork to install the motors and do the wiring. (I must say his wiring on this section was much tidier than his attempt at the first station. (He doesn't think his old man is capable of doing wiring and won't believe me I was doing it before he was a gleam in my eye). We have reached our third station but trackwork has not progressed far yet.


One of my big gripes is that Raymond is a Limited Edition Star Wars Lego builder and sections of the layout baseboard framework are taken up with a huge Death Star, a large X-Wing, a big Millennium Falcon, R2-D2 and other bits and pieces. He has already filled up a spare (?) bedroom upstairs with Lego models and quite a bit of Garden Railway locomotives and rolling stock.


Another of my nagging doubts has been that we have a narrow gauge free-lance Colorado style narrow gauge layout that starts nowhere and ends nowhere, totally isolated from the outside world. I am a big fan of train operations, shunting, making up trains to send somewhere (for a reason) to detach loaded wagons or pick up empties along the way and so on. I needed an interchange of some sort perhaps a standard gauge siding transfer point at one of the stations? However, this is O Scale and while 0n30 takes up a lot of space 0 Scale Standard Gauge takes up a lot more.


I have been reading in Model Railroader and other model railroading magazines about "Staging Sidings" and wondered if that might be a solution to my interchange problem having an imaginary interchange off layout and hidden?


Anyway, back to the story. Darren & Geoff listened and inspected. I really appreciated how they could listen to my grumblings and self-doubt and then discuss (Note -Discuss) with me possible solutions.


1. They agreed that the first station needed simplification and made a number of suggestions especially in relation to fitting in buildings and some dead-end sidings while removing superfluous passing loops and location of industry sidings.


2. They felt that the second station was fine in that it was a junction for a mining branch and that as well as a couple of necessary passing loops, it also had some dead-end sidings serving a mining supply company, and an ore crusher (logical for a mining branch).


3. Darren and Geoff also made some suggestions for buildings around this second station area.


3. They indicated that until we managed to sort out the Lego problem there was no reason why the mining branch could not be built. It could then be operated independently as a small branch line.


4. Darren and Geoff also felt that a hidden staging siding would be the best opportunity for a hidden interchange and indicate a possible location.


Last year I was occupied for much of the year in co-authoring a book about Hudswell Clarke locomotives in the sugar industry in Fiji and Queensland. This year much of my spare time is taken up with a World War 1 Exhibition Gallery for the Museum. However, Raymond and I spent about an hour on Saturday having a brief discussion about our options following on from the advice that the guys have given us.


We generally agreed on a thinning out and slight redesign of the first station yard. This should not be too painful and will result in a much better layout.


Raymond came out of left field with an idea for two different sets of staging tracks. One of these would be a continuation of the branch line trackage around the back of the proposed timber milling scene and then curving into a space behind the shelving towards the work benches - out of the way and utilising a wasted space - probably two sidings.


The second set would be off the main line as it climbs up towards the helix. We were intending to have a passing loop and dead-end siding about half-way up. Instead we will move it back a bit and make it into a simple junction station with the same passing loop and dead-end siding but with the addition of a set of points heading straight ahead through the backscene above the branch line staging sidings into the same wasted space. Possibly four dead-ends? Anyway it sounds feasible just needs some "proper" track planning and further discussion.


I need to get back to my World War 1 Museum Project now


















Saturday, August 30, 2014

No Progress - YET.....



Since my last post way back on 2 February this year there has been little to no progress on the model railway in The Shed. During the past months I have been harassed by Scooter and others to do an update for my Blog. I even have a friend in Houston, Texas looking forward to my next post.



My time has been taken up with work, an operation where I had to have 3 weeks sick leave and not allowed to do anything strenuous for 10 weeks. During the past 8 months I have been working on a book with three good friends and today I think there is light at the end of the tunnel. I have finished selecting all the images and writing the captions (I hope) and the book layout is currently being done.


We are carefully reviewing each few pages of the manuscript as the layout is completed making any final adjustments before it is sent off to the printer. The book is the story of the Hudswell Clarke steam locomotives purchased by the Colonial Sugar Refining Company for use in Fiji and Queensland. It follows on from a book we wrote back in 1982 about the last ten years of Hudswell Clarkes on the Herbert River near Ingham and because this year is the 100th birthday of the HOMEBUSH preserved in working order at the Victoria Mill in Ingham by Wilmar Sugar, the Singapore owners of the CSR Company.
HOMEBUSH is 100 years old this year.

The book is due to be launched in Ingham on Saturday 11 October, an event which I will be attending.

With the book now almost out of the way it is time for Raymond and I to turn our attention back to our On30 layout in The Shed.

We have been wanting to make a start on some scenery for quiet some time now but needed some MDF to make the backscenes. Accordingly this week an orde3r was placed with Mr Ply & Wood at Underwood for 21 lengths of 3 mm MDF 2400 mm X 400 mm. I also ordered what I hope will be the last delivery of plywood we will need – 4 sheets of 12 mm 2400 X 1200 mm.

The ply is required to cut out the track baseboard for the helix that will enable us to get from the top level to the lower level. The delivery is quick and painless. MDF costs only $10 per 2400 X 1200 sheet and the ply $30 plus $30 delivery. The delivery charge is certainly a lot different to that charged by that bulky DIY warehouse which is around $110/delivery. I had ordered 8 sheets of 2400 X 1200 MDF with 7 sheets to be cut to the 2400 X 400 size. Again, unlike that other place, there was no charge for cutting to size.

Hopefully, in the next couple of weeks, Raymond and I will start fitting the MDF as there will be a little bit of notching to be done to accommodate the framework. Once we work that out we will have to paint each a sky blue colour and start mapping in clouds, mountains etc before affixing the sheets to the layout framework.


 

Sunday, February 2, 2014

Stiil Making Progress.....

 
Work has continued on the layout these past few weeks since I last posted on this blog. We did have one major hiccup which caused us some anguish until Saturday afternoon (yesterday).

Raymond had started laying the track  and pointwork around past the Durango Station as seen in my last post but when the track passed across the join in the plywood to the section that heads directly towards the back of The Shed there was a rather significant peak in the track. This was obvious of course as the two sections of plywood were not smooth across the join with one section significantly higher than the other. We tried shimming up the plywood that was lower but that did not work. I had recently purchased a new 600 mm long spirit level to assist in lining up the track on the newly installed turntable and to augment our 900 mm long spirit level which was just too long for some tasks.

Looking towards the right-hand wall of The Shed

The main line and passing loop passing the Durango Station site. The building will be situated on the left of the left-hand track

The track now heads down towards the back of The Shed and the future helix. The join in the plywood which caused us so much heartache can be seen across the centre of this image

Placing this 600 mm long level along one sheet of plywood, even though we had reasonably aligned the two plywood panels it was like a ski-jump. The plywood on the second sheet just seemed to drop away. I recommended rebuilding the two sections of plywood and the baseboard framing to ensure the plywood sheets were in proper alignment.

This would mean lifting the track which Raymond had laid, something he was loathe to do. "We always seem to be redoing track" he says. He perservered last weekend trying to level and properly align the two plywood sections to no avail.

Raymond had been quite ill during the week and came home early on Wednesday. One of Raymond's very talented skills is his ability to think about a problem and come up with a viable solution without having to try it out beforehand. He has displayed this ability many times over the years and impressed staff at the former Railway Historical Centre (RHC), where he worked as a volunteer, when he worked out how to overcome a serious problem with a commercial archival database we were using. He went home with me one evening after work and appeared despondent but next morning he was keen to get to the RHC and test out a solution he had come up with during the night and it worked. This time despite the discomfort he was feeling with his illness he came up with a solution which he put to me yesterday afternoon.

I had gone to see my elderley father by myself on Saturday as Raymond was still not 100% and on the way home I called into Austral Modelcraft to purchase another twelve sets of points and packs of fishplates. When I got home at lunch time he put to me that we needed to lift two sections of track across the plywood join and then sand off the peak where the two boards met. He even directed exactly where we needed to smooth out the hump which was difficult to see. Numerous judicious sanding strokes were needed with a lot of level checks in between. I even broke three sanding belts in the process and had to take a quick trip to Bunnings mid-Saturday afternoon to buy several packs of sanding belts of different grit sizes.

The main line is in the foreground as it heads towards the planned helix. A row of buildings with a road in front will provide a street scene across from the third track which will be behind the flatcar.

Again we can see the plywood join which caused us so many problems as we look towards the section that will contain the Durango Station

Looking towards the right-hand wall. A Raggs to Riches Conoco Oil Depot served by a fishtail siding is planned for the left-hand side of this section and the piece of homasote nearest the camera is a Stoney Creek Designs Scrap Yard kit also to be served by a dead-end siding.

Finally we were satisfied and today Raymond relaid the track. Testing it for level and the runnability of rolling stock it appears perfect. Raymond has since spent the day installing Cobalt point motors and doing the wiring. He had run the Bus Wire yesterday afternoon and now, using suitcase connectors he has wired up the running track and point motors.

This feverish activity is to be ready for the Tuesday Nighters who are coming over this Tuesday night. We think everyone (except Scooter) will be pleased with our progress.

Monday, January 13, 2014

Trackwork Progress.....

Progress is continuing although we have a number of issues to sort out.

We have laid the plywood track base from the right hand wall around to and including the Durango Depot area. It took a considerable effort for us to make sure the curves were true and the plywood was level.


The plywood track base is being added to the baseboard framework. Here we are looking from the location of the Durango Depot towards the right hand wall.

The main line curves around at the right hand wall heading towards the back of The Shed.

The Durango Depot area where the main line curves back down the centre of The Shed on the peninsula. The footprint for the Durano Station building is the piece of 3 mm MDF on the left. It is huge! 46" X 11"

We again have gone through the hiatus of track standards. I printed out another S-7 Standard from the NMRA and some measurements seem to differ to what we had previously. Our concern included the fact that the main line track would be entering the Durango Depot platform on a curve. How much clearance to the platform should we provide? We opted to remeasure one of our K-37 locos to ascertain the widest point using Vernier calipers. This happens to be the window shades over the cab windows which comes out at 68 mm (say 70 mm). So, as we have done previously we have settled on 3 1/2 inches between track centres which should give us a 1/2 inch gap between the cab shades on two K-37 locos passing each other.

Track laying the main line using Brunel Hobbies and Tracksetts templates.

We have settled on this clearance yet again. The minimum curve on our main line is 36 inches so as the main line will be the outer loop into Duirango Depot that curve is a shade over 39 inches and we have made the inner (passing loop) 36 inches. Today we marked out the track centres from the right hand wall through to half way along the Durango Depot. We have now laid the track from the right hand wall as far as the turnout for the main line/passin g loop into Durango Depot.

Raymond has tested this track with a K-36 and everything runs smoothly.

K-36 No 481 stands at the end of track that has just been laid.

Over the past couple of weekends we have also been working on the locomotive depot for the upper terminus along the left-hand wall.

Start of the locomotive depot being built at the end of track on the top level on the left hand wall. The turntable facility is needed to turn the tender engines for their return back around the layout as well as providing some accommodation for our many locos.

The DC Walthers HO Scale130 ft turntable pit has been installed and we have started working out the track requirements.

The turntable required is 65 feet long to allow for the K-36 and K-37 Class 2-8-2 locomotives. It is actually a Walthers HO Scale 130 ft turntable (65 ft in O Scale)

Being a HO Scale turntable our big engines would plough out the handrails and turntable cabin so here is the turntable bridge following the removal of the hanrails and cabin. We will be adding new wider decking as befits the requirements of our locomotives.

The turntable bridge uses Code 83 rail so we visited Austral Modelcraft last week and purchased a box of Peco Code 83 Flex track together with four lengths of adapter track Code 100 to Code 83. We also had a long discussion with Ray and a fellow modeller, Arthur, who both have had experience with the Walthers turntable. From the advice they gave us it appears that the older DC turntable will fit in very well and we need not have worried about any issues with DCC. The newer DCC turntable however, is another matter. It apparently is very susceptible to losing its memory regarding track settings when selecting on of the roads off the turntable. Each road has to be programmed twice (once for each end of the bridge). If there is a power interuption for example when a short circuit occurs or when you turn off the main power to the layout at the end of an operating session you have to reprogram every track again. We have not progressed the track layout on this section while we try to work out how we can overcome this issue with the DCC turntable. Ray/Arthur suggested having a separate DCC power supply just for the turntable - which we will do. There are several separate power circuits in The Shed for the layout and other uses. Near the DCC turntable there are four power points on a separate circuit to everything else. I am thinking we will leave those four power points on all the time even when we shut down power to the layout. We can then plug the DCC power supply into one of these power points and the power will be on all the time. Thunderstorms will be a problem though and will probably fry the DCC chips. We are still considering our options.

Wednesday, January 1, 2014

But Wait Ther's More.....

Both Raymond and I had discussed what our objectives were for the Christmas Break. We had decided that we needed to start work on the locomotive depot planned for the upper terminus before we continued with the plywood base and track laying on the top deck of the centre modules.


The upper and lower decks at right angles to the right hand walls ready for the plywood track supports and track laying to commence

The centre peninsula also clearly showing the overhang extension of the framing outside the footprint of the standard layout space.


Following instructions suggested by Darren we had made the 4 X 1 supports extend beyond the footprint of the rest of the modules as it was on this front corner we were planning to install the Raggs to Riches Durango Depot kit as a feature that could be easily seen when firt entering The Shed. The Durango Depot is some 48 inches long and 11 inches wide. I also wanted to have an extra space in front of the depot for scenery. With this extension of width for the baseboard framing we needed to know that the walkway between this corner and the two proposed (upper and lower) locomotive depots on the left hand wall would be sufficient. I am hoping for preferably 3 feet.

The corner modules again showing the overhang outside the layout footprint. These extensions will be shortened to suit the requirements for the Durango Depot on the upper level and also keeping in mind the need to maintain sufficient accessway between this module and the lower level locomotive depot on the left hand wall

Now we knew that the upper level locomotive depot along the left hand wall would not be a problem as it would be no wider than 2 ft 6 ins and narrowing down to only about 6 inches wide towards the entry door to The Shed. The lower level could be a potential problem, however. I planned to have an 18 inch wide accessway between the left hand wall and the lower locomotive depot (under the upper level loco depot). The lower level loco depot like that on the upper level would incorporate a Walthers HO Scale 130 ft turntable which equates to a 65 ft turntable in O Scale and therefore big enough to accomodate those large Colorado narrow gauge engines of the K-36 and K-37 Class. Obviously the bridges on these turntables would have to be modified to accomodate the widths of these locomotives. The turntable and locomotive depot on the bottom level is also intended to be a layout feature on entry into The Shed as it will be outside the footprint of the upper level locomotive depot..

The upper level locomotive depot baseboard under construction.

The upper level locomotive depot baseboard under construction. The open space underneath will be occupied by the lower locomotive depot extending on from the baseboard framing that can be seen on the lower right.

The Walthers HO Scale 130 ft turntable in position for the upper locomotive depot. The turntable bridge has handrails and a cabin for HO Scale locomotives. These will have to be removed for the O Scale locomotives and new basswood decking, cabin and handrails fitted to suit the "big" engines.
I had purchased this Walthers turntable some years ago as I had always planned to have a locomotive depot and turntable capable of handling the K-36 and K-37 Class locomotives. Now we would need two of these turntables as another would be required for the lower deck. Raymond gave me the second 130 ft turntable for Christmas with this one in a blue box and clearly labelled as being fitted with DCC as distinct from my original which came in a red box and was DC only but was supposedly "DCC convertible".

We have since investigated the DCC Conversion Kit and found their RRP is almost $200 and that they are very difficult to install. We have decided that in the long run it will be best that we purchase yet another DCC turntable (in the blue box) at about $450 and since the original has not been used we will try to sell it "as new". We obviously will not get back our original outlay.

The turntable bridge is fitted with Code 83 Rail so this again is a problem and we have decided not to lay any track on the new loco depot module until we purchase a box of Code 83 Peco FlexTrack and a number of Code100/Code83 Adapter pieces. We will us the adapter pieces for the two tracks leading omto and off the turntable connecting to the main track and all dead-end tracks off the turntable will be laid in Code 83. Austral Modelcraft is open again this weekend after Ray and Aileen have had their Christmas break so we will, hopefully, be able to purchase our Code 83 requirements and also our third (!!!!!) 130 ft turntable. If we can purchase our Code 83 requirements we should be able to lay the track in the loco depot area before the end of the weekend.

Tuesday, December 31, 2013

Progress During October.....



Following my return from the US at the end of September, Raymond and I were ready to tackle some more work on the framing for the baseboard.

I mentioned previously that we had been in a quandry as to how to support the upper deck on the two peninsula modules. The Tuesday Nighters had a meeting at our house after we had finished the two lower deck peninsula modules. We discussed this with the guys and as usual, Darren, practical man that he is, told us exactly how to do it.

Raymond and I followed Darren's recommendations and we soon had the two upper deck modules which we had made previously mounted above the lower deck.

The two upper level baseboard modules have been mounted securely in position. We still had to work out how to build the triangular fill-in on ther corners of the upper and lower levels.

The upper and lower deck extending at right angles from the right-hand wall of The Shed

The two baseboard modules extending down the centre of The Shed towards the future helix.

Looking towards the front of The Shed along the dead-end operating aisle.
Now we had to construct the framing for the triangular in-fill joining the two island modules.

Again, a meeting of the Tuesday Nighters at our home came to our rescue and again, Darren, bless him, gave us detailed instructions on how to do it. The task was easy and worked well.



A good view showing the triangular in-fill on the lower deck


Another view of the triangular infill on the lower deck

Despite all our care in getting our levels and heights right we ended up with an issue where there was a mismatch where the framework along the right-hand wall met up with the peninsula heading away from the wall at right-angles. I tried several different approaches but none suited me. In frustration I phoned our New South Wales friend from nearby Parkinson. Craig (Cassino) was soon over inspewcting the problem and soon came up with a solution that had been staring me in the face all the time through the use of a right angle metal plate. Fixed!


But wait there's more. Tomorrow I will fill you in on what we have achieved during these past few days between celebrating Christmas and working through some more layout issues.


Monday, December 30, 2013

Visit to the United States.....

When I posted this originally the images were too large so hopefully, I have now fixed this.

During August and September 2013, I visited the United States for the first time. Altogether I spent 5 weeks there but only visited two States - California and Colorado with a short visit to northern New Mexico.

The initial incentive for my visit was to attend the 33rd National Narrow Gauge Convention being held in Pasadena on the eastern outskirts of Los Angeles. Since I was travelling to the States I absolutely had to organise visits (and train rides) on the Durango & Silverton Narrow Gauge RR and also the Cumbres & Toltec RR. Being a museum professional, I also had to visit the Colorado Railroad Museum (Denver), the California State Railroad Museum in Sacramento and Steamtown 1897 in Jamestown.

The Narrow Gauge Convention was outstanding. I have attended a few conventions here in Australia but the size of the Narrow Gauge Convention and the 1700 delegates, exhibitors and trade stand attendees was amazing. I met a few Aussie friends over there and met a few new people including Lee Riley from Bachmann and Chris Lane, Editor of the On30 Annual.

The following is a gallery of a few of the many images I took during my visit.



The Hilton Pasadena Hotel was the Convention Hotel for the 33rd National Narrow Gauge Convention and also where I stayed



Rio Grande Southern C-19 No.41 at Knott's Berry Farm


A small scene on a combined On30 Modular layout with modules from all over the United States


Durango and Silverton Railroad K-36 No.486 brings its train along Narrow Gauge Street as it approaches Durango Station


Durango and Silverton RR K-36 No.482 in Silverton
Cumbres and Toltec RR K-36 No.488 departs Chama for Antonito


The Engineer (Driver) of K-36 No.489 oils his engine in Chama yard

Cumbres and Toltec RR K-36 No.487 fitted with a wedge snow-plough stands in Chama yard

The only remaining cab forward Southern Pacific AC-12 No.4294 is preserved in the California State Railroad Museum in Sacramento

Virginia and Truckee RR 2-6-0 preserved in the California State Railroad Museum

San Francisco Cable Car No.54 descends Hyde Street and is about to turn into California Street

San Francisco is not only famous for its cable cars but also its historic trams. The F Line uses these PCC cars that were used all over the US, Canada and Mexico. This one is painted in the famous Pacific Electric livery.
My next post will show some significant progress on our On30 layout.